Summary
Consultancy and Maintenance for a 0.5MW privately owned site in Lincolnshire.

Challenge
In February 2020, the client reported that their plant had been underperforming for the previous two months, operating at an average of 56% CHP utilisation. This was causing insufficient return on investment, making the plant financially unsustainable in the long term. The client required actionable advice and practical ongoing support to increase and sustain yields at optimum levels.
Solution
After undertaking a comprehensive review of the entire site including maintenance requirements and feedstock health Resolve Bioenergy devised an action plan for the client to swiftly optimise plant operations and output. We took over full responsibility for multiple aspects of the site’s performance, including equipment maintenance and ongoing monitoring of biology & feedstock, ensuring maximum yield and stability.
Results
The biological health and output of the plant was significantly improved, equipment was repaired and upgraded, and plant operation was optimised end-to-end to boost performance back up to target levels. . Thanks to its much improved biological and operational state, the plant hit 100% CHP performance within 5 months. Since this time the site has been running at an average of 93% performance.
The below chart shows the data demonstrating the success of our work.