Performance optimisation for a 0.5MW privately owned site in North Yorkshire.

Challenge

Despite the plant performing at a reasonable rate when the client approached us, (approx 80%), our on site audit into its operations revealed there could be further improvements to fine tune performance and maximise return on investment. The client required practical advice and support to identify these key optimisation points and undertake targeted improvements and ongoing maintenance.

Solution

Resolve Bioenergy joined the site in an advisory capacity to provide process support and identify potential optimisation across specific set points. Following a detailed analysis of the site, we provided a package of targeted recommendations including adjustment of feeding times and maintenance procedures designed to maximise overall performance.

Results

Once Resolve Bioenergys recommendations were implemented, the site was fully optimised and performance moved into the 90%+ capacity. The in-depth consultation and analysis provided tailored recommendations to the specific design and requirements of the client’s plant. Maximum performance was achieved within a very short space of time, with the site running at an average of 95% in just 2 months.

The below chart shows the data demonstrating the success of our work.

0% 20% 40% 60% 80% 100% 120% 31/03/2020 30/04/2020 31/05/2020 30/06/2020 31/07/2020 31/08/2020 30/09/2020 31/10/2020 30/11/2020 31/12/2020 31/01/2021 Target CHP 1 Utilisation Actual CHP 1 Utilisation